• Users Online: 905
  • Home
  • Print this page
  • Email this page
Home About us Editorial board Ahead of print Current issue Search Archives Submit article Instructions Subscribe Contacts Login 
ORIGINAL ARTICLE
Year : 2021  |  Volume : 21  |  Issue : 1  |  Page : 45-49

Infrared thermographic evaluation of rise in temperature with conventional versus trephine drills


1 Department of Prosthodontics, Crown and Bridge and Implantology, Rishiraj College of Dental Sciences and Research Centre, Bhopal, Madhya Pradesh, India
2 Department of Prosthodontics, College of Dental Sciences and Hospital, Indore, Madhya Pradesh, India

Correspondence Address:
Dr. Ambika Shrivastava Gupta
Department of Prosthodontics, Crown and Bridge and Implantology, Rishiraj College of Dental Sciences and Research Centre, Bhopal - 462 036, Madhya Pradesh
India
Login to access the Email id

Source of Support: None, Conflict of Interest: None


DOI: 10.4103/jips.jips_252_20

Rights and Permissions

Aim: To compare the rise in temperature using trephines over conventional ones during bone site preparation. Setting and Design: An-vitro, evaluative study Materials and Methods: Twenty implant sites were prepared using pilot drill up to depth of 10 mm on bovine femoral bone. In first part, no irrigation was used. Five sites were prepared using conventional drill of 2.8 mm, and other five were prepared with help of trephine drills. On completion of each drill, infrared thermometer was used to measure temperature on both the drill tip and the shaft. The same procedure was repeated with bone immersed in saline. Statistical Analysis Used: Student t test was used to evaluate the significance of difference. Result: Study showed that the temperature rise at drill tip was significantly higher for trephine drill (52.98 ± 1.67 °C) than conventional drills (48.20 ± 0.67 °C), however the temperature difference in trephine and conventional drills was statistically insignificant. Conclusion: The temperature increase was more distributed in conventional drills than trephine. Copious irrigation is thus mandatory for trephine drills. Intermittent drilling is preferred with conventional drills.


[FULL TEXT] [PDF]*
Print this article     Email this article
 Next article
 Previous article
 Table of Contents

 Similar in PUBMED
   Search Pubmed for
   Search in Google Scholar for
 Related articles
 Citation Manager
 Access Statistics
 Reader Comments
 Email Alert *
 Add to My List *
 * Requires registration (Free)
 

 Article Access Statistics
    Viewed330    
    Printed2    
    Emailed0    
    PDF Downloaded29    
    Comments [Add]    

Recommend this journal